High-Speed Rail — Love Planet Earth

17,000 miles.
Zero traffic.

The proposal: a fully automated maglev high-speed rail network stitching together the top 100 US cities and 503 commercial airports — built in five years, with fares capped between $5 and $50. This is what it would take, what it would cost, and whether it could actually happen.

The vision

A spiderweb of steel and magnets

The HSR-26 proposal imagines the United States divided into 75 civil infrastructure sectors, all building simultaneously — elevated maglev viaducts and subterranean tunnels going up in parallel instead of in sequence. Superconducting magnetic assemblies lift the trains off the rails entirely: no friction, no wheels, speeds that make short-haul flights pointless. The 15 Super-Mega Ports feed the build directly, pumping 120 million metric tons of steel onto finished track sections to accelerate the inner trunks.

🗺️ Explore all 287 stops →
Every station on the network with a cost breakdown, proposed terminal site, city facts, and before/after aerial mock-ups.
Interactive proposal map

Hover a trunk to see every stop

All six trunks from the HSR-26 proposal, drawn as one interoperable maglev grid — in the proposal's own "no sharp corners" curving style. Hover or tap any colored line.

Proposal network. Corridors and stops are exactly as named in the HSR-26 proposal documents — a vision map, not an engineering survey. Positions are approximate; only the Northeast Corridor and Brightline Florida segments overlap real operating rail.

The network

Six trunks, one system

Every corridor below is named in the proposal documents. Together they form a single interoperable maglev grid.

Trunk 01 · Maglev

Northeast Corridor Trunk

The spine it all hangs on: Boston–New York–Philadelphia–Washington, the densest travel market in the country. This is where maglev proves itself first — replacing the congested Acela corridor and the I-95 parking lot with 300+ mph service. The proposal routes construction crews and materials for the coastal defense mega-projects (BOS-1, NYC-2, LIS-3) along this same trunk.

Trunk 02 · Maglev

Southeast Trunk / Atlantic Spine

Washington down through Raleigh, Charlotte, and Atlanta to Jacksonville, Orlando, and Miami — the Atlantic seaboard's missing link. It ties the Southeast's booming metros into the national grid and feeds the Florida mega-projects (MIA-9, TPA-14, JAX-10), including the planned Straits of Florida terminus at the Miami offshore port.

Trunk 03 · Maglev

Texas Star Triangle

Dallas–Houston–San Antonio (with Austin on the loop): the Texas Triangle is already one of the world's great mega-regions, and the proposal treats it as a self-contained high-frequency maglev circuit. It also serves as the logistics backbone for the Gulf Coast mega-projects — GAL-12, SAB-16, CRP-18 — moving structural alloys straight from interior stockpiles to deepwater gates.

Trunk 04 · Maglev

West Coast Spine

Seattle–Portland–San Francisco–Los Angeles–San Diego: the Pacific corridor, running the full length of the coast the proposal is trying to defend (SFO-20, AST-21, SEA-22). This is the trunk that would finally do what California's conventional high-speed rail has struggled to deliver — true 300+ mph service, with the 260,000-strong Golden Gate barrier workforce riding it daily.

Trunk 05 · Maglev

Midwest Hub (Chicago)

Chicago as the beating heart: spokes radiating to Minneapolis, Detroit, St. Louis, Kansas City, and onward. The proposal leans on this hub to deploy 140,000 tradespeople across the Great Lakes Control Grid (GLC-25) and to pump Midwestern agricultural cargo from the Mississippi Delta Super-Hub straight onto global trade lines.

Trunk 06 · Maglev

Transcontinental Links

The long bridges that make it a national network: New York–Chicago–Denver–Salt Lake City–San Francisco across the north, Los Angeles–Phoenix–Dallas–Atlanta–Washington across the south, and Chicago–Dallas–New Orleans tying the interior together. These are the hardest miles — mountains, deserts, and thin demand — but they're what turn regional systems into one country-spanning grid.

Phase 2 · The network grows

One continent, three countries

Phase 1 wires the United States. Phase 2 takes the same grid international — north to the four most populous metros in Canada, and south down the spine of Mexico, all the way to Mexico City.

Schematic map of the trinational network: Phase 1 trunks in the United States, Phase 2 dashed extensions to Vancouver, Calgary, Toronto, Montreal, and down the Mexico spine to Mexico City

Phase 2 schematic — dashed lines are the proposed international extensions. Positions approximate; this is a vision map, not an engineering survey.

Phase 2 · Trunk 07 · Maglev · ~140 mi

Cascadia Extension

Seattle–Vancouver: the shortest new miles in Phase 2 and the easiest border on the map. The West Coast Spine simply keeps going north, joining the Pacific Northwest's two great port cities — 140 miles apart with no fast way between them today. Vancouver's metro holds 3.1 million people, and the corridor already has a name, a studied route, and a century of cross-border habit behind it.

Phase 2 · Trunk 08 · Maglev · ~1,180 mi

Great Lakes–St. Lawrence Trunk

Chicago–Detroit–Windsor–Toronto–Kingston–Montreal, with a second Montreal feed from New York via Albany. This rides Canada's own number-one rail axis — the Quebec City–Windsor corridor — and plugs it into the Midwest Hub. Toronto (7.1 million) would be one of the largest metros on the entire grid; Montreal (4.6 million) gets two ways in, from Chicago and from New York.

Phase 2 · Trunk 09 · Maglev · ~950 mi

Calgary Northern Link

Minneapolis–Great Falls–Lethbridge–Calgary: the northern-tier alignment, crossing the plains the way the Empire Builder still does. Calgary (1.8 million) is Canada's fourth-largest metro and its energy capital. These are the longest, emptiest miles in Phase 2 — and paired with the Rockies Link (Trunk 11), they give Calgary two ways in: east across the plains from Minneapolis, and west through the mountains from Vancouver.

Phase 2 · Trunk 10 · Maglev · ~850 mi

The Mexico Spine

San Antonio–Laredo–Monterrey–San Luis Potosí–Querétaro–Mexico City, straight off the Texas Star Triangle. It stops at Monterrey (5.3 million, Mexico's industrial capital) and Querétaro — where Mexico is already building real passenger rail toward the capital today — and terminates in Mexico City, whose 22.3-million-person metro area is the largest in North America. At Phase 1 speeds the whole run is about three hours.

Phase 2 · Trunk 11 · Maglev · ~530 mi

The Rockies Link

Vancouver–Kamloops–Revelstoke–Banff–Calgary: the line that joins Canada's two western metros, following the Canadian Pacific's historic mountain alignment through Rogers Pass and Kicking Horse Pass. At Phase 1 speeds it is about a two-hour run; today the same trip is a ten-hour drive through the mountains. It makes Calgary a true junction — the Pacific one way, the prairies and Chicago the other — and Canada's west one system instead of two stubs. The honest price: this is the most expensive segment in Phase 2, hundreds of miles of avalanche country and some of the longest tunnels on the continent.

+3,630
miles of new Phase 2 track
20,630
miles in the full trinational system
3
countries on one interoperable grid
8
new headline stops: Vancouver, Calgary, Toronto, Montreal, Monterrey, San Luis Potosí, Querétaro, Mexico City
~47M
people in the metro areas Phase 2 adds
~3 hrs
San Antonio to Mexico City at Phase 1 speeds

Canadian metro populations: Statistics Canada estimates, July 2025. Mexican metro populations: 2020 census. Every Phase 2 stop is queued for the same per-stop atlas treatment as the 287 Phase 1 stops — cost breakdown, proposed terminal site, city facts, and before/after aerial mock-ups.

The honest catch: Phase 2 is a diplomacy project wearing a rail costume. Three countries means three safety regimes, three funding fights, and border crossings that need the rail equivalent of the pre-clearance the US and Canada already run at airports. The Calgary link carries the same thin-demand risk as Phase 1's transcontinental miles, and the Rockies Link is where Phase 2's construction money concentrates — mountain tunneling is never cheap. None of that is an engineering problem — and on this network, engineering was never the hard part.
By the numbers

The proposal, quantified

17,000
miles of automated maglev track
75
civil infrastructure sectors building simultaneously
100
top US cities connected
503
commercial airports linked to the grid
1.8M
active field workers, engineers, and operators
$8.5T
total budget — $1.7T deployed per year for 5 years
$5–$50
passenger fare cap at launch
5 yrs
target buildout window, all sectors in parallel

Figures are from the HSR-26 proposal (Report 26 of the 30 Mega-Projects series). For scale: $8.5 trillion is roughly a third of current US annual GDP, deployed over five years.

Honest accounting

Pros & cons

The case for it

  1. It works everywhere it's been tried at scale. Japan's Shinkansen has run for 60+ years with zero passenger fatalities and carries roughly a billion riders a year. France's TGV turned its Paris–Lyon line profitable within years of opening in 1981.
  2. China proved the construction pace is possible. China went from zero high-speed rail in 2008 to roughly 50,000 km by the end of 2025 — more than the rest of the world combined — connecting 97% of its cities over 500,000 people.
  3. Maglev is the genuine next step. Shanghai's Transrapid has run commercially since 2004 at 431 km/h. No wheel friction means higher speeds, lower maintenance, and quieter operation than conventional high-speed rail.
  4. The climate math is overwhelming. High-speed rail emits on the order of 90% less CO₂ per passenger-kilometer than short-haul flights. Replacing the busiest US air corridors (NYC–DC, LA–SF, Dallas–Houston) would cut millions of tons of aviation emissions annually.
  5. Fare caps change who can travel. A $5–$50 cap would make intercity travel affordable in a way no US airline or Amtrak service is today — the network becomes public infrastructure, like the interstate highways, not a luxury product.

The case against it

  1. Land acquisition at this scale is brutal. 17,000 miles of new right-of-way means eminent domain across thousands of properties, tribal lands, and protected areas. The proposal's "non-litigable construction variances" assume away the single hardest part of American infrastructure.
  2. US construction costs are in another universe. California's high-speed rail was sold at ~$33 billion for ~500 miles; it's now projected past $100 billion with no opening date. At US cost levels, 17,000 miles could run multiples of the $8.5T budget.
  3. Maglev at national scale is unproven. The only commercial maglev in the world is Shanghai's 30 km airport shuttle. Nobody has ever built — or operated — a 17,000-mile maglev network. The technology risk is real.
  4. The politics are the project. A five-year, $8.5T build requires uninterrupted bipartisan commitment across multiple election cycles, plus the "48-hour approval loop" overriding environmental law — a legal and political revolution disguised as a rail plan.
  5. Some corridors may never pay. Dense corridors (Northeast, Texas Triangle, California) have obvious demand. A transcontinental maglev across the Great Plains and Rockies risks becoming the world's fastest empty train.
Feasibility verdict

Could this actually be built?

The honest answer is: the engineering is the easy part. China built roughly 50,000 km of high-speed rail in under two decades, which proves that a determined state can lay track at continental scale. Maglev itself works — the physics are settled and the Shanghai line has run safely for 20 years.

The hard parts are cost and governance. California's experience suggests American high-speed rail costs 3–5× what comparable projects cost abroad, driven by land acquisition, litigation, and fragmented authority. And no country has ever attempted maglev at even 1% of this scale — 17,000 miles of superconducting guideway is an extrapolation, not a precedent.

The five-year timeline is the least believable element: it requires 75 sectors building in perfect parallel, 1.8 million workers materializing on schedule, and a legal regime that simply doesn't exist in the United States. A phased 20–30 year build of the densest corridors first — the approach every successful rail nation actually used — is the version of this vision with real precedent behind it.

Verdict: technically feasible, financially staggering, politically the hardest infrastructure project in American history. Start with the Northeast Corridor and the Texas Triangle; prove the model; then go continental.

Aerial mock-up · from the proposal

What it would look like finished

"A sprawling, highly organized spiderweb of elevated viaducts and ground-level tracks curving organically through the American landscape, completely bypassing 90-degree angles and sharp corners."

— HSR-26 aerial mock-up description, Foreign Labor & Deployment appendix

The proposal's design standard calls for "Non-Euclidean Urban Design" — no sharp corners anywhere in the network, with tracks flowing in continuous curves. Year 1 is the 75-front mobilization; years 2–3 lay track and bore tunnels around protected lands; year 4 injects port aggregates to accelerate the inner trunks; year 5 is electrification and launch under the $5–$50 fare cap.