Midwest Hub

Flint, MI

Stop on the proposed 17,000-mile maglev network. Next stop: Sterling Heights, MI (44.8 mi).

About Flint

Flint, occasionally flintstone (SiO2), is a sedimentary cryptocrystalline form of the mineral quartz, categorized as the variety of chert that occurs in chalk or marly limestone. Historically, flint was widely used to make stone tools and start fires.

Source: Wikipedia summary (full article). Population and facts as published there.

Cost breakdown (proposal-scale estimates — see math)

⚠️ All figures below are parametric estimates scaled from the proposal's own budget ($8.5T ÷ 17,000 mi ≈ $500M per mile), not engineering quotes. Methodology is shown so you can check the math.
ItemBasisEstimate
Terminal constructionMid-size terminal (parametric range $1-2B)$1.5B
Land acquisitionRegional factor 1× on $200M base$200M
Track: Flint → Sterling Heights44.8 mi × $500M/mi$22.4B
Annual operations (share)Staffing, power, maintenance$30M/yr
Stop total (excl. annual ops)$24.1B

Best terminal location (proposed)

The downtown district around the former Grand Trunk station. Flint's downtown still centers on its rail heritage near the former Grand Trunk station, with the Durant-Dort district and the cultural center nearby. The active rail corridors through the city offer guideway right-of-way, and the site connects the Vehicle City directly to the Detroit corridor.

Before / after

Before and after aerial mock-up of the proposed maglev terminal at Flint, MI

Aerial mock-up (illustrative, not an engineering rendering). Left: the proposed site today. Right: with the maglev terminal.

🛤️ Infill stops toward Sterling Heights: the proposal envisions more stops than cities — smaller stations between majors. Plausible infills on this leg: