Northeast Corridor

Baltimore, MD

Stop on the proposed 17,000-mile maglev network. Next stop: Washington, DC (35.2 mi).

About Baltimore

Baltimore, also known as Baltimore City, is the most populous city in the U.S. state of Maryland. It is the 30th-most populous U.S.

Source: Wikipedia summary (full article). Population and facts as published there.

Cost breakdown (proposal-scale estimates — see math)

⚠️ All figures below are parametric estimates scaled from the proposal's own budget ($8.5T ÷ 17,000 mi ≈ $500M per mile), not engineering quotes. Methodology is shown so you can check the math.
ItemBasisEstimate
Terminal constructionLarge-city terminal — 1–4M metro ($2–4B range)$3B
Land acquisitionRegional factor 1.5× on $200M base$300M
Track: Baltimore → Washington35.2 mi × $500M/mi$17.6B
Annual operations (share)Staffing, power, maintenance$60M/yr
Stop total (excl. annual ops)$20.9B

Best terminal location (proposed)

the Penn Station district. The existing Amtrak, MARC and Light Rail hub is already mid-redevelopment, proving expansion appetite. It sits at the natural midpoint of the Baltimore–Washington corridor, capturing both cities' commuters. Downtown and Johns Hopkins catchments are minutes away.

Before / after

Before and after aerial mock-up of the proposed maglev terminal at Baltimore, MD

Aerial mock-up (illustrative, not an engineering rendering). Left: the proposed site today. Right: with the maglev terminal.

🛤️ Infill stops toward Washington: the proposal envisions more stops than cities — smaller stations between majors. Plausible infills on this leg:
← All 287 stops