Transcontinental Links

Broken Arrow, OK

Stop on the proposed 17,000-mile maglev network. Next stop: Tulsa, OK (13.4 mi).

About Broken Arrow

Broken Arrow is a city in Tulsa and Wagoner counties in the U.S. state of Oklahoma. It is the largest suburb of Tulsa.

Source: Wikipedia summary (full article). Population and facts as published there.

Cost breakdown (proposal-scale estimates — see math)

⚠️ All figures below are parametric estimates scaled from the proposal's own budget ($8.5T ÷ 17,000 mi ≈ $500M per mile), not engineering quotes. Methodology is shown so you can check the math.
ItemBasisEstimate
Terminal constructionSmall-city terminal (parametric range $0.5–1B)$0.75B
Land acquisitionRegional factor 1.0× on $200M base$200M
Track: Broken Arrow → Tulsa13.4 mi × $500M/mi$6.7B
Annual operations (share)Staffing, power, maintenance$15M/yr
Stop total (excl. annual ops)$7.7B

Best terminal location (proposed)

The Rose District / downtown Broken Arrow rail corridor. The Rose District's revitalized Main Street runs along the historic rail corridor that gave the city its start, with the city actively planning around it. A terminal here serves Tulsa's largest suburb at its civic heart rather than at a highway interchange.

Before / after

Before and after aerial mock-up of the proposed maglev terminal at Broken Arrow, OK

Aerial mock-up (illustrative, not an engineering rendering). Left: the proposed site today. Right: with the maglev terminal.

🛤️ Infill stops toward Tulsa: the proposal envisions more stops than cities — smaller stations between majors. Plausible infills on this leg:
← All 287 stops